SWTC SWC · Egypt

货都到亚历山大港了,才发现少一张Egypt COC,每天滞港费够再发一柜

Brothers doing business in the Egyptian market, pay attention — Egypt has a mandatory certification called Egypt COC, and the issuing body is GOEIC (General Organization for Export and Import Control). Simply put, this is the passport through Egyptian customs — without this certificate, your goods will be stuck at the port and cannot be cleared. It governs whether products comply with Egyptian standards and safety requirements. It is not just a stamp — it requires a whole set of test reports, inspections, and document reviews. Many factories think having CE or ISO is enough — sorry, Egypt does not recognize those; they only recognize COC certificates under their own system.

Which products require it? The scope is quite broad. Common ones include: home appliances (refrigerators, air conditioners, fans, electric kettles), lighting, power cords and plugs, toys, textiles, footwear, food-contact materials (tableware, pots), building materials (tiles, sanitary ware), auto parts, batteries, etc. Basically, anything electrical, anything that comes into contact with people, and anything for children will most likely be covered. You can check GOEIC's controlled list for specifics, but don't guess — if you guess wrong, it will be too late to fix once the goods reach the port. There are three most common pitfalls: First, product labels and manuals must be in Arabic — English will not do, and many factories fail here. Second, test reports must be issued by laboratories recognized by GOEIC — ones you find yourself through a third party do not count. Third, the inspection stage — factories think submitting documents is the end of it, but when the inspector arrives on site and finds that the product model does not match the report, it is rejected outright. There is also a minor pitfall: the importer information on the certificate must match the bill of lading — change even one word and you have to start over.

Regarding timelines, if everything goes smoothly, it takes about 3-4 weeks from document submission to obtaining the certificate, but that is on the basis that test reports are complete and inspection passes the first time. If additional testing is required, or if problems are found during inspection and rectification is needed, dragging on to 6-8 weeks is also normal. So don't wait until the goods are finished to start applying — it is best to begin preparations mid-production and leave enough buffer. One final reminder: COC must be done for every batch of goods — it is not one-time. Don't think one certificate can cover everything. When looking for an agent, ask clearly whether they have a direct channel with a GOEIC-recognized institution, and don't let second- or third-hand subcontracting waste your time.

下一篇

把你的产品和目的国发给我们,工程师给方案。

发给工程师